Ideas for Incentivizing Relays

Additional ‘fully loaded’ costs to consider:

  • Ongoing maintenance – non-trivial in an emerging/rapidly evolving category
  • Driving (and maintaining) validator adoption – i.e. the ‘build it and they will come’ fallacy
  • Bandwidth
5 Likes